Industrial plant, Janikowo
204t
STEEL STRUCTURE
4520m2
AREA
Supply of flue gas catalytic denitrification and desulphurization installations in a combined heat and power plant located
The scope of provided works covered design services, replacing and modification of technological equipment during boilers shout downs (replacing of id-fans and motors, replacing of air pre-heaters together with heat baskets and modification of necessary installations, installation of dampers), production, delivery and erection of supporting steel structures, absorber, flue gas ducts and delivery and installation of technical insulation.