Industrial Plant

scroll

SUPPLY OF FLUE GAS CATALYTIC DENITRIFICATION AND DESULPHURIZATION INSTALLATIONS IN A COMBINED HEAT AND POWER PLANT


204tons

STEEL STRUCTURE

4520m2

AREA

The scope of provided works covered

  • design services, replacing and modification of technological equipment during boilers shout downs (replacing of id-fans and motors, replacing of air pre-heaters together with heat baskets and modification of necessary installations, installation of dampers)
  • production, delivery and erection of supporting steel structures, absorber, flue gas ducts and delivery and installation of technical insulation